Split level timber frame house overcomes steep site
Cork city split level timber frame house with passive solar design, rainwater harvesting, renewables & green material
Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus.
The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction.
While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance.
Dip in, and enjoy!
Cork city split level timber frame house with passive solar design, rainwater harvesting, renewables & green material
A log bungalow in rural Meath has been extended and given a total energy upgrade – and wood is at the heart of the renovation, with a timber frame extension and external insulation system along with a fresh log finish.
Words: Lenny Antonelli
Nottingham passive house enters Solar Decathlon
Construct Ireland Journalist Frank Coles investigates the impact posed by the Energy Performance of Buildings Directive
Up to 150,000 workers are at potential risk of developing fatal lung cancer as a result of exposure to dangerously high levels of radiation, while a leading radon expert has cited ‘widespread confusion amongst employers’ regarding their legal requirements.
Plans for the first Irish eco-village have been in the works since 1999, but – finally – work is well underway at The Village in Cloughjordan, Co Tipperary. Following a site visit in December, Lenny Antonelli gives an overview of the innovative project’s renewable energy district heating system and sustainable planning and community design approach, before profiling four of the first houses to be built.