From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Zero carbon

Zero Carbon
Nottingham passive house enters Solar Decathlon

Telling it Like it is

0206planningtitle.jpg
Iain Douglas, President of the Irish Planning Institute reveals his views on the state of planning in Ireland, and the factors which could not only damage the environment in Ireland, but also cause social segregation, and aid unsustainable development across Ireland

Environmental Authority

Clare County Council show the way with new sustainable offices
As long term readers of Construct Ireland will recall, the mainstreaming in recent years of sustainable design and construction has been exemplified in many innovative local authority offices. John Hearne visited Aras Contae an Chláir, and discovered a building which attempts to holistically minimise environmental impact, with attention paid to more than just energy performance and carbon emissions.

Interior Motives

0209designtitle.jpg
In line with a growing consumer demand, the availability of green products is constantly increasing, leading to a situation where product quality need not be compromised in a search for a more eco friendly interior, as Jill Phillips of zero4zero7 interior design explains.

Dead heat

0301-deadheattitle.jpg
As energy prices continue to rise, the Irish construction industry is moving into uncharted territory, where all elements that affect energy performance—from orientation, to building design, to specification, to standard of workmanship—are increasingly recognised as key concerns.

Steep decline

Brian Cowen
The worl­d has learned the hard way that our political leaders lacked the judgement and resolve to identify and address the problems which led to the recession. Richard Douthwaite argues that a similarly flawed judgement is evident in the assumption that the economy will recover, and advises on how to prepare for a future of global economic contraction.

A room with a view

Room with a view
Nowhere demonstrates the need for a high-performance building envelope quite like a coastal site. John Hearne visited a cutting edge timber frame house overlooking Sligo Bay that was designed to achieve a highly insulated, air-tight and low embodied energy envelope whilst making the most of the spectacular vista.

Retrofit: Top tips

Top Tips
As the en masse energy upgrading of Irish homes and other buildings takes-off on an unprecedented scale, there are real dangers that even conscientious clients, professionals and contractors will make decisions that fail to save energy and create unhealthy buildings. Pioneering green architect Joseph Little, draws from the research and experience of his architectural practice & Building Life Consultancy to offer advice that should be heeded before any energy upgrade.

Going Underground

Geothermal heating is being specified by everyone from self-builders to developers to local authorities in increasing frequency across Ireland. As a relatively new technology in Ireland, it is crucial that anyone considering a geothermal system knows what they are getting into, to ensure an efficient, reliable heating source.

With over 20 years experience in this field in Ireland, Dr Paul Sikora, Vice Chairman of the Geothermal Association of Ireland explains what issues to be aware of when considering geothermal, from site suitability, to what to look for from suppliers and installers.

Fingal Commits

 

If you’re applying for planning permission to build in Cappagh, North Ballymun or Northwest Balbriggan, 30% of your heating must come from renewable energy, and your heating must be less than 50Kwh/m2 per annum—roughly twice the standard of most new homes.