Opinion - Is passive house going mainstream?

Archie O’Donnell, projects coordinator for Éasca and the Irish Passive House Association
Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus.
The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction.
While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance.
Dip in, and enjoy!

Archie O’Donnell, projects coordinator for Éasca and the Irish Passive House Association

After a long struggle to build their home, Karen and Steve Ward finally got their wish — an energy efficient, timber frame house that boasts a palette of healthy and ecological materials and a fully renewable heating system.

Mixing excellent thermal performance with renewable heating, efforts to boost biodiversity and plans for micro-generation, a new timber frame house in rural Cork shows that both appealing design and low environmental impact can be achieved with one-off rural housing.

Semi-state business Bord Gáis have placed green innovation at the centre of their business strategy. As CEO John Mullins reveals, pay as you save and renewable energy will shape the company’s future.
In the hands of the right architect, meeting the passive house standard needn’t involve compromising on design. Construct Ireland visited a recently certified passive house which shows that a seamless low energy architecture is possible

In the second installment of a new feature on international green buildings, Lenny Antonelli takes a look at four innovative, sustainable and striking buildings from around the world.


If you’re applying for planning permission to build in Cappagh, North Ballymun or Northwest Balbriggan, 30% of your heating must come from renewable energy, and your heating must be less than 50Kwh/m2 per annum—roughly twice the standard of most new homes.

In light of the failure of AER 5 and the widespread pessimism in the wind industry regarding converting AER 6 contracts into operating wind farms, we asked the six main political parties what their proposals are for the development of an Irish wind industry.