Warning
  • JUser: :_load: Unable to load user with ID: 222

From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Passive assessment

Passive Assessment
Built in 2004, Tomás O’Leary's house in Wicklow was the first in the country to be certified by the Passive House Institute — but how would it fare when subjected to a BER assessment six years later?

Radon

0203radontitle.jpg
Up to 150,000 workers are at potential risk of developing fatal lung cancer as a result of exposure to dangerously high levels of radiation, while a leading radon expert has cited ‘widespread confusion amongst employers’ regarding their legal requirements.

Breaking the mould - part III

Breaking the mould
In April this year the first NSAI Agrément certificate was issued for the application of external insulation to existing dwellings. Joseph Little of leading green architects Joseph Little Architects used analysis from his practice’s Building Life Consultancy service to assess the certificate, and encountered issues which raised questions over whether it should have been issued in its current form.

Opinion

0502-Opinion-SMALL.jpg
Semi-state business Bord Gáis have placed green innovation at the centre of their business strategy. As CEO John Mullins reveals, pay as you save and renewable energy will shape the company’s future.

Heated agrément

0408-Heated-Agrement-SMALL Earlier this summer SEI announced that, from December, external wall insulation systems must have Irish Agrément certification to be eligible for support under the Home Energy Saving scheme. But many in the green building sector are critical of the decision, and some are questioning the value and purpose of Agrément. Lenny Antonelli reports.

Part L Revealed

0311-PartLRevealedTITLE.jpg
Since the announcement last September by the Minister for the Environment of substantial improvements to be made under Part L of the Building Regulations, speculation has been rife in the construction industry about what the details of the updated regulations would entail. Jeff Colley examines some of the key parts of a regulatory improvement that will help the Irish construction industry to modernise and meet the demands of a rapidly changing world.

Dynamic Ducting

0204hrvtitle.jpg
Heat recovery ventilation, a technology that has become a standard building application in Scandinavian countries, is rapidly gaining recognition in Ireland as a solution to both problems.

Rathdrum passive refurb

Rathdrum Passive Refurb
Randy Ralston and Mel Cronin aimed for the passive house standard with their upgrade, and though they didn’t quite get there they ended up with a house that produces more energy than it consumes, making it one of the country’s flagship green renovation projects.

Out of the Woods

0305-longfordhousingtitle.jpg
Many of the opportunities that trees offer for sustainable building are harnessed by a housing development in Ballymahon, Co. Longford which combines timber frame construction with recycled newspaper insulation and wood pellet heating. Adding in solar panels and attention to detail for airtightness, these low energy, low carbon homes reveal a developer who sees a bright future in going green. John Hearne visited the site to find out more.

King of the castle stars

Ireland's largest passive house development to date, Shanganagh Castle, is proof that with proper planning and collaboration, delivering high density housing doesn’t mean compromising on quality or climate action – without increasing costs or causing delays.