SMET Building Products has advised those specifying floor screed to avoid product failure, particularly in heated screeds, by ensuring their choice of products meets the right standards. “Historically, floor screed failures have regularly resulted from the interaction of heated screed constructions with a wide range of coverings. Failure by the contractor to check on residual moisture and consequent installation of coverings on an overly wet screed may have serious implications for the durability and longevity of the flooring,” said Joris Smet of SMET Building Products.
Traditional screeds require significant drying before the final floor covering can be installed, however, if this is not well planned for, it may well delay the completion of the entire project.