From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Daintree

0211daintreetitle.jpg
The Daintree Building is a mixed-use, sustainable urban building on Pleasant’s Place, just off Camden St. Dublin , writes Brian O’Brien of Solearth Architects. Conceived in 1999 it has been a long development process—but by late September Daintree should be open for business and the ever innovative Daintree (Paper Co) Ltd will have a new home, one appropriate to the delightfulness of their products and their focus on nature’s generosity for their raw materials.

From recession to renewables

0304-recessiontorenewablestitle.jpg
The notion that curbing CO2 emissions would damage economic growth has been used as an excuse from developed countries such as the USA not to switch from fossil fuels to renewable energy. However, as Richard Douthwaite reveals, the people of Austrian town Güssing are discovering firsthand that this couldn’t be further from the truth.

Nervous Energy

Will Ireland miss existing house energy rating deadline?
Fears are growing amongst energy rating trainers that Ireland is running out of time to ensure building energy ratings are in place for existing homes at point of sale or rental from January. Jeff Colley spoke to SEI and to leading figures involved in energy rating training to find out more and shed some light on how homes will be assessed.

Good form

0404-Good-Form-SMALL.jpg
If you are at all worried about keeping construction costs down and lengthening the useable lifespan of your building, it’s critical that energy performance is considered from the earliest stages of planning and design. John Hearne spoke to a number of leading Irish experts in sustainable design about following simple principles of orientation, form and layout to achieve substantial energy improvements for free

Green Town

0303-greentowntitle.jpg
As of 2006 there is more and more talk in Ireland about the house of tomorrow and some very progressive houses have been built that go far beyond the basic legislative requirements for modern housing. Among them is Baile Glas, a development of twelve social and affordable housing units in Lombardstown, County Cork, initiated by the Blackwater Resource Development Agency and Cork County Council. Construct Ireland’s Jason Walsh finds out more.

Thermal bridging

Thermal bridging
U-value alone is a blunt instrument for gauging the thermal performance of a building. Ground-breaking eco architects Joseph Little and Benat Arregi of Building Life Consultancy explain why our increasingly ambitious insulation efforts must involve a rigorous attention to thermal bridging if we’re serious about creating low energy, healthy buildings.

Gimme shelter

Gimme Shelter
Designing a low energy building when you've got unlimited space is one thing – but what if you need to make your walls thin to maximise space on a small site in an architectural conservation area? Lenny Antonelli visited a new St Vincent De Paul sheltered housing project that fit a lot of sustainable features on to a small plot in Dublin's north inner city.

Air-tight case

How & why to achieve excellence in air-tightness
Air-tightness is a key factor in any low energy build, but is often overlooked in comparison to energy sources and insulation. Lenny Antonelli examines how air-tightness is achieved in buildings, from design stage down to the final sealing