Design Approaches

Acquired taste

Acquired-Taste
The Department of Agriculture’s new Food Safety Centre is a deceptively simple building that combines natural ventilation and lighting with energy efficiency - all on a designed natural landscape that seeks to both boost biodiversity and prevent flooding. Lenny Antonelli visited the County Kildare site to find out more

Hempcrete retreat

Hempcrete
No matter how energy efficient a building method is, constructing a house from scratch will always cause some damage to the environment - but what if a building material could absorb more carbon than it causes to be released over its life cycle? Lenny Antonelli visits a hempcrete house in Co. Down that seeks to trial this innovative method of building

Good form

0404-Good-Form-SMALL.jpg
If you are at all worried about keeping construction costs down and lengthening the useable lifespan of your building, it’s critical that energy performance is considered from the earliest stages of planning and design. John Hearne spoke to a number of leading Irish experts in sustainable design about following simple principles of orientation, form and layout to achieve substantial energy improvements for free

A Class Apart

Galway Bay Solar Apartments
Kevin O’Flaherty’s
development overlooking Galway Bay combines impressive energy saving techniques with the sorts of features that buyers of high-spec homes have grown to expect, as John Hearne discovers.

Sound Advice - Acoustic solutions

0210soundtitle.jpg
When designing and building high density apartment and housing developments, the attention, so often lacking, to acoustic performance, can have a critical impact on the quality of life of the buildings’ inhabitants, as leading acoustic consultant Jim Dunne, Managing Director of Integrated Acoustic Solutions explains

A Breath of Fresh Air

O310-BreathOfFreshAirTITLE.jpg
Prestige commercial buildings can place a heavy toll on the environment, typically relying in Ireland on carbon intensive grid electricity to power air conditioning systems throughout the warmer parts of the year and inefficient electric lighting – often all year around. Completed in November 2004, software company SAP’s Galway offices offer a rare opportunity to find out how a natural ventilated and low energy lighting building is working in practice, as John Hearne reveals.