Warning
  • JUser: :_load: Unable to load user with ID: 222

From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Moate point

Moate point
A new development in County Westmeath answers a nagging question about district heating: how to make it financially viable when it services energy efficient buildings. Lenny Antonelli visited a housing estate that combines low energy design with an innovative district heating system and ecological timber frame construction

Group effort

0302-groupefforttitle.jpg
With the age of cheap and abundant fossil fuel energy coming to an end, district heating, where a development is heated from a single, centralised heat source is becoming an increasingly attractive option due to the capital and running cost, efficiency and environmental benefits it can offer. Paraic Davis of Davis Associates mechanical and electrical engineers explains why district heating has become a viable and increasingly popular choice in Ireland.

Ireland's most airtight house?

Ireland's most airtight house?
An experienced timber framer with an eye for detail, Tim O'Donovan set about building a low energy stick-built home in the Cork countryside and achieved a staggering level of airtightness
Words: Lenny Antonelli

Fingal Commits

 

If you’re applying for planning permission to build in Cappagh, North Ballymun or Northwest Balbriggan, 30% of your heating must come from renewable energy, and your heating must be less than 50Kwh/m2 per annum—roughly twice the standard of most new homes.

Killeagh, Co. Cork

0302-killeaghtitle.jpg
The rapidly growing public interest in sustainable building is finally starting to impact on property developers. Bill Quigley of Nutech Consultants describes an innovative 200 house development currently on site in Co. Cork where forward-thinking developers J & W Leahy Brothers have decided that the market is ready for low energy, low CO2 buildings.

Zero waste

Zero waste extension
Upgrading and extending a semi-detached house on a tight site in Limerick required ingenuity from architect Patti O’Neill.

Access All Areas

0204disacctitle.jpg
A little foresight at the design stage can go a long way in determining a building’s success. If a building’s design fails to take into consideration the needs of any potential occupants and users, the risk of the need for corrective work, often at considerable cost, is greatly increased.
Construct Ireland’s Architecture Correspondent Lauren Kapusta reports

Q&A: Eaga

Ci asks EAGA
Energy upgrade specialists Eaga are responsible for technical training on SEAI’s Home Energy Saving scheme. Eaga technical manager Paul Wilson answers some key technical questions on the installation of boilers and heating arising from the recent contractor training.

Why Knott?

0204timbertitle.jpg
Lorna Kelly, of the Irish Timber Frame Manafacturers Association, takes a look at IrishTimber Frame