From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Ireland's inevitable default

Ireland's inevitable default
Richard Douthwaite explains why the bailout may turn out to be a gift to Ireland, and offers some advice for dealing with a default.

Dundalk green housing

Dundalk Green Housing
Sustainable Dundalk housing project designed to prolong the independence of older residents

Solvent green

0406-Solvent-Green-SMALL.jpg
The market for new residential build may have bottomed out, but compared to the rest of the construction industry the sustainable building sector appears buoyant. Changing market conditions, various government incentives and updated building regulations are all helping greener building companies - but with few houses likely to be built this year and capital restricted, challenges still lie ahead. Lenny Antonelli reports

The Eco House

0212ecohousetitle.jpg
Recently sold by private tender for over e1.3 million, the ECO House in Shankill, Co. Dublin exceeded auctioneers expectations, an indicative example of the shift from public curiosity to eagerness to invest in contemporary sustainable building.

Conscientious objection

0309-conscientiousobjectiontitle.jpg
Walter P. Toolan and Sons, a firm of solicitors in Ballinamore, County Leitrim has redeveloped its office with the intention of creating a healthy, environmentally sound building. Jason Walsh visited the office to find out more.

Ballymurrin House

0303-ballymurintitle.jpg
If achieving eco buildings is challenging for new build, it is doubly so for renovation projects. Philip & Delphine Geoghegan of iCon Architecture & Uban Design describe a low impact renovation that balances these apparent tensions with great success.

Coillte Teoranta

0208coilltetitle.jpg
The building is the first all timber office complex in Ireland. It covers almost 2,300m2 of floor space and provides accommodation for almost 100 staff working in a wide range of forestry related disciplines.

Antiseptic

Why Ireland’s failing treatment systems & septic tanks must be tackled
Why Ireland’s failing treatment systems & septic tanks must be tackled

Sustainable Sewage

0301-douthwaitetitle.jpg
There’s rather more to designing a sustainable building than specifying low-embodied energy materials and making sure it will require little energy and maintenance in use. Low water demand and the ability to get the nutrients discharged in the sewage back to the land are important too.

Peak timing

Peak timing
As the organisation entrusted by OECD countries to predict future global energy supplies, the International Energy Agency’s projections have significant impact on energy policy around the world. IEA officials recently told The Guardian that the organisation’s figures on oil supply had been inflated and that oil peak is happening. Richard Douthwaite assesses the fall out