Pass Judgement

Passive houses have long been considered the ultimate in low energy buildings. So when it comes to BERs, why don’t they always get a straight A? Lenny Antonelli investigates.
Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus.
The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction.
While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance.
Dip in, and enjoy!

Passive houses have long been considered the ultimate in low energy buildings. So when it comes to BERs, why don’t they always get a straight A? Lenny Antonelli investigates.

The Carroll’s cigarette factory in Dundalk has been reborn as an avant garde exemplar of wind energy storage and an ingenious approach to integrated heating, ventilation and cooling, as sustainable design expert Chris Croly of BDP explains.

Recently sold by private tender for over e1.3 million, the ECO House in Shankill, Co. Dublin exceeded auctioneers expectations, an indicative example of the shift from public curiosity to eagerness to invest in contemporary sustainable building.

Newly elected Green Party Ministers John Gormley & Eamon Ryan talk to Construct Ireland about their vision for a sustainable future.
In
issue 2 we reported on an innovative new energy bike scheme being
implemented in Sligo. Its instigator, Wilhelm Bodewigs, got in touch to
tell us about an interesting Tram system proposal for the county

Much of the housing built around Dublin over the last forty years has been built of single-leaf nine-inch hollow block construction – which are both notoriously energy inefficient and extremely difficult to insulate effectively without causing damp problems. Lenny Antonelli visited a hollow block house which has been ecologically renovated to protect occupant health whilst shooting to the top of the energy rating scale.

‘‘We have a body of extremely experienced and competent staff who will be able to hit the ground running”


Construct Ireland spoke to Adi Roche to find out about the progress so far, and the need for continuing support.

As the January 2006 deadline for implementation of the EU Directive on the Energy Performance of Buildings draws ever nearer, the Irish Government has spelt out its plans to delay the across the board introduction of building energy ratings until 2009. But how does this compare to other EU Member States?